• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

  • About
  • Portfolio
  • Services
  • Blog
  • Contact

  • About
  • Portfolio
  • Services
  • Blog
  • Contact

Commercial

A New Restaurant In An Old Building

2022-12-27 by

This restaurant was a long time in the making. When the owners first bought the property, they needed to build out the brewery first and then design the restaurant. That is why this restaurant is unique. When you get a window seat, you don't look ...

the spot restaurant renovation

2016-02-04 by

The Spot Restaurant in Georgetown, MA, was our first project with the Serenitee Restaurant Group. They signed a lease with the building owner and were ready to transform the existing Irish Pub into a new "Local's Tavern." The dining room layout ...

warwick mall commercial condominium

2016-01-16 by

While employed at Carter-Burgess, I was the Project Coordinator for the anchor building renovation at the Warwick Mall. The owners of the mall had made a decision to turn this area into commercial condominiums.  We needed to provide access to the ...

  • 1
  • 2
  • Next Pagearrow_forward

Primary Sidebar

We welcome you to subscribe to the CHD email list and receive the latest updates directly to your inbox. Required fields are marked *

Categories

  • 01 Project Information
  • 02 Pre Design
  • 03 Schematic Design
  • 04 Design Development
  • 05 Construction Documents

Popular posts

6 Key Drawing Types For Residential Construction Documents

The 6 Key Drawing Types For Residential Construction Documents

2016-08-23

design development

The Major Elements of The Design Development Phase

2016-07-12

schematic design residential project

You Need To Energize Your Project During Schematic Design

2016-06-28

We welcome you to subscribe to the CHD email list and receive the latest updates directly to your inbox. Required fields are marked *

Recent Posts

  • The 6 Key Drawing Types For Residential Construction Documents
  • The Major Elements of The Design Development Phase
  • You Need To Energize Your Project During Schematic Design
  • Why Existing Conditions Are So Important
  • The project information phase, is the glue that keeps everything together

Categories

  • 01 Project Information
  • 02 Pre Design
  • 03 Schematic Design
  • 04 Design Development
  • 05 Construction Documents

Craig Herrmann Design, Inc.
43 Gloucester Ave. Suite 2F, Gloucester MA 01930USA
978-233-1CHD (1243)
Copyright © 2023