• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

  • About
  • Portfolio
  • Services
  • Blog
  • Contact

  • About
  • Portfolio
  • Services
  • Blog
  • Contact

BIM/3D MODELING

2015-12-16 by

We utilize 3D modeling techniques throughout our projects. Some are general design models to visualize an idea or to understand a particular space and others are intelligent models that extend past general massing and continue to evolve into the documentation for construction.

Primary Sidebar

We welcome you to subscribe to the CHD email list and receive the latest updates directly to your inbox. Required fields are marked *

Categories

  • 01 Project Information
  • 02 Pre Design
  • 03 Schematic Design
  • 04 Design Development
  • 05 Construction Documents

Popular posts

6 Key Drawing Types For Residential Construction Documents

The 6 Key Drawing Types For Residential Construction Documents

2016-08-23

design development

The Major Elements of The Design Development Phase

2016-07-12

schematic design residential project

You Need To Energize Your Project During Schematic Design

2016-06-28

We welcome you to subscribe to the CHD email list and receive the latest updates directly to your inbox. Required fields are marked *

Recent Posts

  • The 6 Key Drawing Types For Residential Construction Documents
  • The Major Elements of The Design Development Phase
  • You Need To Energize Your Project During Schematic Design
  • Why Existing Conditions Are So Important
  • The project information phase, is the glue that keeps everything together

Categories

  • 01 Project Information
  • 02 Pre Design
  • 03 Schematic Design
  • 04 Design Development
  • 05 Construction Documents

Craig Herrmann Design, Inc.
43 Gloucester Ave. Suite 2F, Gloucester MA 01930USA
978-233-1CHD (1243)
Copyright © 2023